Education Center Construction
Week of
February 17, 2002

Monday, February 19 -- Water and gas lines are
extended from the east (gym) end of the building
towards the west (street) end. This gas line
welding is taking place in the cafeteria area.
The "wings" of the stage are constructed. The
dirt ramp, which has allowed equipment to
move between the levels, will soon be removed.
The other side of the stage. This week tar
paper will be applied to the roof and a great
deal of interior framing will be done.
This strip of lumber was bolted to the gym
wall to allow framing of the mezzanine,
storage, and weight room areas.
cfeb46.jpg (16003 bytes) cfeb47.jpg (30534 bytes)
Tuesday, February 19 -- The boundaries for the
gym storage areas, weight room, and guest
locker rooms are laid out on the floor.
Fire sprinkler lines are dropped, awaiting
the installation of the drop ceiling.
cfeb48.jpg (14488 bytes) cfeb49.jpg (28572 bytes)
Wednesday, February 20 -- Ventilation
ducts are installed in the science lab area.
Steel framing is installed for the computer
lab walls. This wall is a firewall and extends
all the way to the roof.
cfeb50.jpg (23122 bytes) cfeb51.jpg (21758 bytes)
The dirt ramp by the stage is removed. A bird's eye view from the gym ceiling.
cfeb52.jpg (30244 bytes) cfeb53.jpg (21382 bytes)
Framing for the guest locker areas has begun. Roof trusses are bolted to the outside wall.
cfeb54.jpg (28155 bytes) cfeb55.jpg (25722 bytes)
Thursday, February 21 -- Installation of
ductwork continues in the science lab area.
Framing for the back classrooms
now defines their dimensions.
cfeb56.jpg (44518 bytes) cfeb57.jpg (28160 bytes)
Fire sprinklers are installed in the gymnasium. The weight room area is
framed out in the gymnasium.
cfeb58.jpg (17885 bytes) cfeb59.jpg (26234 bytes)
Friday, February 22-- More framing work today.
This view is from the entrance door to the left
of the chapel. The hallway is now defined
with the administration area on the left and
the chapel on the right.
In the foreground, fixtures for
main restrooms were installed.
cfeb60.jpg (26655 bytes) cfeb61.jpg (21082 bytes)
Framing for the guest locker room, weight
room, and storage areas is nearly complete.
Interior work on framing, plumbing, electrical,
and ventilation will bring great changes to the
interior over the next few weeks.