Education Center
Construction
Week of
February 17, 2002
![]() |
![]() |
|||
| Monday, February 19 -- Water and gas lines are extended from the east (gym) end of the building towards the west (street) end. This gas line welding is taking place in the cafeteria area. |
The "wings" of the stage are constructed. The dirt ramp, which has allowed equipment to move between the levels, will soon be removed. |
|||
![]() |
![]() |
|||
| The other side of the stage. This week tar paper will be applied to the roof and a great deal of interior framing will be done. |
This strip of lumber was bolted to the gym wall to allow framing of the mezzanine, storage, and weight room areas. |
|||
![]() |
![]() |
|||
| Tuesday,
February 19 -- The boundaries for the gym storage areas, weight room, and guest locker rooms are laid out on the floor. |
Fire
sprinkler lines are dropped, awaiting the installation of the drop ceiling. |
|||
![]() |
![]() |
|||
| Wednesday,
February 20 -- Ventilation ducts are installed in the science lab area. |
Steel
framing is installed for the computer lab walls. This wall is a firewall and extends all the way to the roof. |
|||
![]() |
![]() |
|||
| The dirt ramp by the stage is removed. | A bird's eye view from the gym ceiling. | |||
![]() |
![]() |
|||
| Framing for the guest locker areas has begun. | Roof trusses are bolted to the outside wall. | |||
![]() |
![]() |
|||
| Thursday,
February 21 -- Installation of ductwork continues in the science lab area. |
Framing
for the back classrooms now defines their dimensions. |
|||
![]() |
![]() |
|||
| Fire sprinklers are installed in the gymnasium. | The
weight room area is framed out in the gymnasium. |
|||
![]() |
![]() |
|||
| Friday,
February 22-- More framing work today. This view is from the entrance door to the left of the chapel. The hallway is now defined with the administration area on the left and the chapel on the right. |
In the foreground, fixtures for main restrooms were installed. |
|||
![]() |
![]() |
|||
| Framing for the guest locker room, weight room, and storage areas is nearly complete. |
Interior work on framing, plumbing, electrical, and ventilation will bring great changes to the interior over the next few weeks. Check out the news from the recent Association meeting. |
|||