Education Center Construction
Week of
February 24, 2002

cfeb62.jpg (20747 bytes) cfeb65.jpg (30185 bytes)
Monday, February 25 -- With the first phase of
roof work completed, workers removed excess
material from the roof today.
A view looking west across the
building from the gymnasium side.
cfeb63.jpg (25140 bytes) cfeb64.jpg (26749 bytes)
This view, also looking west down the back
corridor, has classrooms on both sides. The
door to the science lab is visible at the end
of the hall.
A few steps forward and turning to the left,
gives this view across the main restroom
area into the chapel.
cfeb66.jpg (32880 bytes) cfeb67.jpg (29901 bytes)
Tuesday, February 26 -- Duct
work in the administration area
Steel framing work is proceeding rapidly.
cfeb68.jpg (22624 bytes) cfeb69.jpg (21077 bytes)
The stage area is getting framed out. A peek over the roof-line shows
preparations for applying the next layer.
cfeb70.jpg (24765 bytes) cfeb71.jpg (27997 bytes)
Wednesday, February 27 -- The office
reception area takes shape.
Offices and work areas in the
administration area are framed.
cfeb72.jpg (27732 bytes) cfeb73.jpg (17281 bytes)
Joists for the mezzanine floor
were hoisted into position.
Flooring will soon be added to the mezzanine.
cfeb74.jpg (19855 bytes) cfeb75.jpg (22732 bytes)
Thursday, February 28 -- Corner entrances
for the chapel were framed.
Workers construct the main stage area.
cfeb76.jpg (26249 bytes) cfeb77.jpg (27995 bytes)
A large number of electrical boxes
and conduit appeared today.
HVAC workers insulate the duct-work.
cfeb78.jpg (30279 bytes)

Many interior changes occured this week. There will
be no new pictures until Monday due to teachers' conference in La Mesa on Friday.