Education Center Construction
Week of
November 25, 2001

cnov25.jpg (24318 bytes) cnov26.jpg (31341 bytes)
Wednesday, November 28 -- The waiting
is over! The process of placing the wall
panels begins.
Students are excited to see
the building take shape.
cnov27.jpg (22809 bytes) cnov28.jpg (21894 bytes)
The huge crane is able to lift the panels
into place in a matter of minutes.
These panels form the east wall of the
gymnasium. The shorter walls behind form
the locker room area.
cnov29.jpg (30362 bytes) cnov30.jpg (34228 bytes)
The locker room area walls The east wall of the gymnasium complete
cnov31.jpg (24104 bytes) cnov32.jpg (29281 bytes)
Starting the north (back) wall of the building Another panel for the back wall
cnov33.jpg (19363 bytes) cnov34.jpg (24882 bytes)
Concrete and rebar will fill the gaps and firm
up the support of the walls.
The back wall from the outside
cnov35.jpg (20359 bytes) cnov36.jpg (18076 bytes)
The panels are placed so that there is
only an inch of space between them.
The rear wall from the outside almost
two-thirds complete. The three high
windows provide light to the gym.
cnov37.jpg (18798 bytes) cnov38.jpg (27141 bytes)
The locker room area from the back, looking
out to the football field. The two far doors
are for restrooms accessible from the gym
or the football field.
An amazing transformation in a single day!
This view is from the southeast corner of
the gym towards the northwest corner. The
rest of the first twenty-two panels will be
placed tomorrow.
cnov39.jpg (15089 bytes) cnov40.jpg (17479 bytes)
Thursday, Nobember 29 -- By 8:00 a.m. today,
all remaining panels had  been placed. This is
the office entrance (left) and main entrance
(right) just to the left of the chapel.
The administration area (left) and
chapel side walls.
cnov41.jpg (15645 bytes) cnov42.jpg (16369 bytes)
These three large areas will house (from L to R):
the chapel, cafeteria/kitchen, and gymnasium.
Friday, November 30 -- The work thus
far as seen from the football field.
cnov43.jpg (19094 bytes) cnov44.jpg (20867 bytes)
Workers clean open areas in preparation for
the construction of the forms for the remaining
walls which will begin Monday.
The entire back wall from Central Ave.

Upcoming Work:
Dec. 17 -- remaining wall poured
Dec. 27 -- remaining walls positioned
Jan. 2002 -- Roof trusses installed

Last Week | Next Week

Updated: 10/30/03